Technical information

Max Capacity
5,000kg

Max Travel
up to 16,000mm

Internal & External

Optional steel structure

Swing door & Roller shutter

Minimal pit & headroom

Bespoke platform sizes available
Why Choose the APL7?
Designed for environments where reliability and load-handling capability are critical, the APL7 Hydraulic Goods Lift provides a practical solution for moving goods safely between floors. Its hydraulic operation delivers steady, controlled travel, making it particularly suitable for facilities that require consistent performance throughout the working day.
The APL7 is commonly specified where the movement of trolleys, pallets, stock, equipment, or supplies is an essential part of daily operations. It is well suited to warehouses, retail and supermarket back-of-house areas, hotels, hospitals, manufacturing sites, and commercial buildings, helping to streamline workflows and reduce manual handling.
With the ability to be tailored to suit different layouts and operational demands, the APL7 offers a dependable, long-term goods-handling solution that integrates seamlessly into a wide range of working environments.
Easy installation
The APL7 Hydraulic Goods Lift is designed for straightforward installation in both new-build and refurbishment projects. It can be supplied with bespoke platform sizes to fit within existing lift shafts, reducing the need for structural alteration.
Where no shaft is available, the APL7 can be delivered with a steel structure, providing a complete, ready-to-install solution. This flexibility allows for efficient installation in environments such as warehouses, mezzanine levels, and back-of-house areas, with minimal disruption to operations.
For further information or to request a quotation, please contact us to speak to an experienced member of our team.
Support every step of the way
Our service is a start-to-finish, top-to-bottom one for anyone who is seeking to have a cabin lift created and fitted in their property. Our team operates in accordance with the following three-step process:
Design & Planning
We work closely with our clients to deliver the right platform lift solution from start to finish. Our process begins with a specialist site survey to assess your property and requirements, followed by collaborative design and specification to ensure the lift is perfectly suited to your requirements.
Installation
Our dedicated projects team is meticulous in their approach, providing detailed survey reports and ensuring that any works carried out by your builders (or ours) are carefully reviewed and checked. This attention to detail helps guarantee a smooth, efficient lift installation and ensures everything is in place before installation begins.
Maintenance
We provide comprehensive aftercare and ongoing support for all our clients, supported by cost-effective service and maintenance packages to keep your lift operating safely and reliably. For complete peace of mind, our 24/7 emergency call-out service is always available, ensuring prompt, expert assistance whenever it’s needed.
Get in touch to discuss your lift requirements
Frequently asked questions
With a product range that’s designed around versatility, we can build a platform lift that’s crafted specifically to your requirements and the space you have available. Give us a call today to discuss your needs.
The maximum weight capacity for our vertical lifts ranges from 300kg (47 stones) to 500kg (78 stones), though weights vary across different models.
The required headroom varies for each lift model, however, this is usually somewhere between 2,100mm and 23,500mm.
The maximum travel of our vertical lifts varies for each model, however, we can fit platform lifts up to 14.5m.
No – you can choose to exit at the back (known as open through) or even at the side (open adjacent).
The maximum legal speed is 0.15 meters per second.
No – although we prefer a small pit (between 60mm and 120 mm deep), we can easily fit a small ramp if this is not possible.
We can either work with your chosen builder or we can carry out all the work ourselves. Our complete turn key solution keeps project timing to a minimum and our dedicated Project Manager will keep you informed at every stage of the process.
The lead time from order through to installation is usually around 6-11 weeks depending on the type of lift you choose. The fitting process usually takes between 2 and 5 days, depending on the complexity of the project.
No – all our platform lifts run off single phase 240v power supply.
You won’t – all of our vertical platform lifts come with battery-powered emergency lowering, which will slowly lower the cabin to the ground floor in the event of a power outage. In addition, all our lifts are fitted with an auto-dialler or telephone.